PLEASE NOTE. This is a very early launch of a platform designed to update stakeholders and observers of Its Time solar schools’ projects. Current, historical and up-coming projects will be gradually added. As will the various information panels below. It is a considerable development project and we appreciate your patience as it evolves over the coming weeks. Almost certainly there will be a bug or two along the way - should you notice any issues or have ideas to improve the platform, your message is appreciated message via: iitime.org/contact-us

Ratu Lalabalavu Secondary  (2581 Nadroga-Navosa)

About

Docs & Links

Specifications

Works & Maintenance

CO2 & $s

Contacts

Charge data

Term Reports

Procedures

Google map

About


On Malolo Island in the north west of Fiji, 10 teachers provide classes for 60 students in years 9, 10, 11 and 12.

To build a relationship with the village a resort developer installed a solar system at the school in 2020. The panel structure was good quality and with plenty of generation power, but unfortunately the inverter/battery system was incorrect and the batteries failed within a year causing a safety incident. The inverter also failed. We are using the existing panels and installed a new inverter/battery configuration.

FTR the resort was not built, and the developers left the country after being exposed for illegal dredging the nearby coral reef to create better access to the proposed resort.

A donor also supplied a new LED data projector and 20 kgs of library books focused on sustainability.

School Role & Facilities
Students:
Teachers:
Classrooms:
Kindergarten:
Offices:
Library/computer area:
Teachers homes in the school grounds:
Boarders (live-in students):
Hostels (Boarding houses):
Dining rooms:
Comments and other bulidings:
Date entered:
Project Funding

Donor anonymous.

Our school commits to have a group of students spend at least 15 minutes, most weeks, picking up plastics. So, we keep our small patch on the earth as free of plastic as possible - its a small action we do to protect marine and other wildlife. We hope all schools in the world join us in doing the same.

For sustainability

Our projects

Plastic Pick up Activity

Started: 2023 Status: Ongoing
One or more of our team spends at least 15 minutes each week (or at least one hour each month) picking up plastics in our area. So, we keep our small part of the earth as free of plastic as possible - it's a small action we do to protect marine and other wildlife. We hope all businesses and organisations in the world will join us in doing the same.

No Video

Visit our project on:

Carbon Dioxide and Financial Savings
Document

Ratu Lalabalavu Secondary

Annual school fuel saving (litres) (1)

2,400

Annual fuel saving 7 teachers' homes getting solar (litres) (2)

350

Annual cartage saving (litres) (3)

360

Total annual fuel saving (litres) (4)

3,230

Fuel saving over 30 years (litres)

96,900

Annual CO2 saving (kgs)

8,236

CO2 saving over 30 years (kgs)

247,095

Annual AUD saving (8)

$ 7,260

Annual USD saving

$ 4,936

Annual FJD saving

$ 10,890

30 yrs AUD saving

$ 217,800

30 yrs USD saving

$ 143,190

30 yrs FJD saving

$ 315,900

Total of All It's Time Solar Schools

Total annual school fuel saving (litres)

20,540

Total annual fuel saving 91 teachers' homes getting solar (litres)

4,150

Total annual cartage saving (litres)

3,081

Total annual fuel saving (litres) (4)

27,886

Total fuel saving over 30 years (litres)

836,580

Total annual CO2 saving (kgs)

71,103

Total CO2 saving over 30 years (kgs)

2,133,277

Total annual AUD saving (8)

$ 78,672

Total annual USD saving

$ 53,489

Total annual FJD saving

$ 118,008

Total 30 yrs AUD saving

$ 2,360,160

Total 30 yrs USD saving

$ 1,578,540

Total 30 yrs FJD saving

$ 3,482,640

Assumptions

Fuel cost in the islands in AUD/litre (5)

2.00

Fuel cartage consideration % (3)

0.15

Annual fuel consumption per teacher's home wired (litres) (2)

50.00

Annual generator maintenance consideration AUD (6)

1500.00

CO2 produced per litre of fuel burned (kgs) (7)

2.55

AUD to USD conversion rate used

0.68

AUD to FJD conversion rate used

1.50

Notes

(1) This is the annual fuel consumption based on reporting from the school at the time of school survey and affirmed at the time of installation. It refers to direct fuel use by the school, not including teachers' homes.

(2) The fuel consumption of teachers' homes varies considerable between homes and over time. Their sources of energy varies from their own small generators to shared generators, still some use kerosene for lighting and some small solar (often failing) for lights and charging. Recently on Beqa Island two of the 7 households at one school were each using 10 litres of fuel per week and some were using very little. So, we have chosen the conservative underestimate of each household saving of 2 litres per week (approx. 5 kgs of CO2).

(3) Most schools have a cost to get fuel to the school - usually small boats and car/truck on the mainland. The costs vary from small amounts to some schools where the cartage cost is almost the same as the cost of the fuel itself. The cartage consideration (dollar and carbon cost) is a percentage of the total fuel consumption, because it varies widely from school to school we have chosen quite a conservative estimate.

(4) Includes cartage and teachers' home consumption estimate that therefore contribute to the total CO2 saving. But we do not include the teachers home in the financial saving - rather we just refer to the savings from the school generator.

(5) This is the current published diesel price in Fiji presented in AUD. Often the islands pay a higher price, but that is not factored in, so generally the price will be a small under estimation.

(6) Generators often require repairs and eventually replacement. That cost varies significantly from school to school, so a conservative value is applied to represent this component of cost/saving for all schools. It is not possible to calculate that accurately for every school, hence the estimate across all.

(7) Burning diesel produces CO2 at a rate of 2.68 kgs/litre, whereas petrol produces it at a rate of 2.31 kgs/litre. We have chosen 2.55 as the approximate for our calculations because there is more diesel used than petrol in the school generators.

(8) The fuel savings in the teachers' homes are not included in the calculation of financial savings for the school. Although teachers are asked to make a small contribution each term (FJD70) for their now 24-hour power and this goes to the school to buy more education resources.

Specifications
Document
20 June 2023

To build a relationship with the village a resort developer installed a solar system at the school in 2020. The panel structure was good quality and well enough power for the school. Unfortunately the inverter/battery system was incorrect and the batteries were damaged within a year and inverter failed. So, we are used the existing good quality panels and installing a new inverter/battery configuration.


DC Coupled

Inverters

Inverter type

Victron MultiPlus-II/5000

Charge controller

Victron MPPT 250/100

Panels

Panel type

Yingli 255

Number of panels

24

Array (watts)

6120

Mountings

Mountings

Roof mounted

Brand

Using existing mounts.

Batteries

Battery type

Simpliphi PHI 3.8 Lithium Ferro Phosphate

Number of batteries

6

Kilowatt hours

22.8

Batteries mounted

Simpliphi Boss 6 Cabinet


General electrical works

Most of the school has quality electrical wiring and only a few general repairs were needed. But four teachers quarters needed new wiring as the exiting was not to standard. Also, a new circuit was be laid to the school generator for back up.

4 amp breakers are installed into the teachers' homes - this limits appliances to a maximum 960 watts and capacity to use modest sized electrical appliances, but not electric cook tops etc. That power limiting strategy means effective use of a reasonably sized school solar system and all in the school community are very happy to have this balanced level of 24-hour power supply.


Partners

Solar contractor

Clay Engineering

General electric works constractor

Extreme Electrical


Contacts
Document

Enter all contacts e.g School Manager, Head Teacher, Principal. The more the better.
If a contact changes, for example the principal, edit the old record to show the new person’s details.

New First Name Last Name Position Phone Email FB Note Edited
Charge data
Don't have login?
Document

This data is currently only available to the school and admin.

  Event

Works & Maintenance
Powered by Sustainable Social - an Its Time Foundation initiative Copyright Its Time Foundation 2023.