PLEASE NOTE. This is a very early launch of a platform designed to update stakeholders and observers of Its Time solar schools’ projects. Current, historical and up-coming projects will be gradually added. As will the various information panels below. It is a considerable development project and we appreciate your patience as it evolves over the coming weeks. Almost certainly there will be a bug or two along the way - should you notice any issues or have ideas to improve the platform, your message is appreciated message via: iitime.org/contact-us

Tabiang Primary School  (1245 Cakaudrove)

About

Docs & Links

Specifications

Works & Maintenance

CO2 & $s

Contacts

Charge data

Term Reports

Procedures

Google map

About

Tabiang on Rabi Island in the north east of Fiji has 117 students with 5 teachers are providing classes from years K to 8.

At the time of the installation, the school had a diesel generator that failed so were hiring one for FJD50 per day and running it for an average of two hours per day and on a needs basis in the evening for the teachers to get their work done. That money and the fuel cost can now be used for education resources at the school.

School Role & Facilities
Students:
Teachers:
Classrooms:
Kindergarten:
Offices:
Library/computer area:
Teachers homes in the school grounds:
Boarders (live-in students):
Hostels (Boarding houses):
Dining rooms:
Date entered:
Project Funding

Its Time Foundation general donors


Carbon Dioxide and Financial Savings
Document

Tabiang Primary School

Annual school fuel saving (litres) (1)

800

Annual fuel saving 2 teachers' homes getting solar (litres) (2)

100

Annual cartage saving (litres) (3)

120

Total annual fuel saving (litres) (4)

1,060

Fuel saving over 30 years (litres)

31,800

Annual CO2 saving (kgs)

2,703

CO2 saving over 30 years (kgs)

81,090

Annual AUD saving (8)

$ 3,420

Annual USD saving

$ 2,325

Annual FJD saving

$ 5,130

30 yrs AUD saving

$ 102,600

30 yrs USD saving

$ 68,130

30 yrs FJD saving

$ 150,300

Total of All It's Time Solar Schools

Total annual school fuel saving (litres)

20,540

Total annual fuel saving 91 teachers' homes getting solar (litres)

4,150

Total annual cartage saving (litres)

3,081

Total annual fuel saving (litres) (4)

27,886

Total fuel saving over 30 years (litres)

836,580

Total annual CO2 saving (kgs)

71,103

Total CO2 saving over 30 years (kgs)

2,133,277

Total annual AUD saving (8)

$ 78,672

Total annual USD saving

$ 53,489

Total annual FJD saving

$ 118,008

Total 30 yrs AUD saving

$ 2,360,160

Total 30 yrs USD saving

$ 1,578,540

Total 30 yrs FJD saving

$ 3,482,640

Assumptions

Fuel cost in the islands in AUD/litre (5)

2.00

Fuel cartage consideration % (3)

0.15

Annual fuel consumption per teacher's home wired (litres) (2)

50.00

Annual generator maintenance consideration AUD (6)

1500.00

CO2 produced per litre of fuel burned (kgs) (7)

2.55

AUD to USD conversion rate used

0.68

AUD to FJD conversion rate used

1.50

Notes

(1) This is the annual fuel consumption based on reporting from the school at the time of school survey and affirmed at the time of installation. It refers to direct fuel use by the school, not including teachers' homes.

(2) The fuel consumption of teachers' homes varies considerable between homes and over time. Their sources of energy varies from their own small generators to shared generators, still some use kerosene for lighting and some small solar (often failing) for lights and charging. Recently on Beqa Island two of the 7 households at one school were each using 10 litres of fuel per week and some were using very little. So, we have chosen the conservative underestimate of each household saving of 2 litres per week (approx. 5 kgs of CO2).

(3) Most schools have a cost to get fuel to the school - usually small boats and car/truck on the mainland. The costs vary from small amounts to some schools where the cartage cost is almost the same as the cost of the fuel itself. The cartage consideration (dollar and carbon cost) is a percentage of the total fuel consumption, because it varies widely from school to school we have chosen quite a conservative estimate.

(4) Includes cartage and teachers' home consumption estimate that therefore contribute to the total CO2 saving. But we do not include the teachers home in the financial saving - rather we just refer to the savings from the school generator.

(5) This is the current published diesel price in Fiji presented in AUD. Often the islands pay a higher price, but that is not factored in, so generally the price will be a small under estimation.

(6) Generators often require repairs and eventually replacement. That cost varies significantly from school to school, so a conservative value is applied to represent this component of cost/saving for all schools. It is not possible to calculate that accurately for every school, hence the estimate across all.

(7) Burning diesel produces CO2 at a rate of 2.68 kgs/litre, whereas petrol produces it at a rate of 2.31 kgs/litre. We have chosen 2.55 as the approximate for our calculations because there is more diesel used than petrol in the school generators.

(8) The fuel savings in the teachers' homes are not included in the calculation of financial savings for the school. Although teachers are asked to make a small contribution each term (FJD70) for their now 24-hour power and this goes to the school to buy more education resources.

Specifications
Document
20 February 2018

We upgraded the nearby Rabi High school solar system with a larger system. The panels from the original system at that school (installed in 2008) were redeployed to Tabiang primary school. The small battery bank we install at the time was replaced with new Lithium batteries in 2023. This small system is serving the school well as there is only 2 teachers' home drawing from the system.


DC Coupled

Inverters

Inverter type

Outback FlexPowerOne

Charge controller

1 x Outback FlexMax 60

Panels

Panel type

BP 175

Number of panels

12

Array (watts)

2100

Mountings

Mountings

Ground mounted

Brand

Clenergy Solar Terrace II

Batteries

Battery type

Simpliphi PHI 3.8 Lithium Ferro Phosphate

Number of batteries

4

Kilowatt hours

15.0

Batteries mounted

IBR Prewired Cabinet


General electrical works

The kindergarten and one teacher's home were fully wired. The other teacher's home wiring was repaired. Extensive rewiring of the school building that had particularly dangerous wiring.


Partners

Solar contractor

CBS Power Solutions

General electric works constractor

CBS Power Solutions

Contacts
Document

Enter all contacts e.g School Manager, Head Teacher, Principal. The more the better.
If a contact changes, for example the principal, edit the old record to show the new person’s details.

New First Name Last Name Position Phone Email FB Note Edited
Charge data
Don't have login?
Document

This data is currently only available to the school and admin.

  Event

Docs & Links
Works & Maintenance
Powered by Sustainable Social - an Its Time Foundation initiative Copyright Its Time Foundation 2023.